Engineering geology

Geological research before construction, always relevant. There are several methods to resolve this problem.

The most common and traditional is shallow drilling notched samples of the soil and their further study. The main disadvantage of this method is time consuming and therefore more time and material costs. The proposed methods allow you to perform geological surveys, drastically reducing the amount of exploration drilling, and in some cases, abandoning it!

What it gives the benefits?

• Colossal reducing research time : 3.5 hours for a full treatment area of 2500 square meters. m ( in the case of research on the depth of 7 meters and about 5 hours , if required a large depth).

• As a result, significant savings of human and material resources.

• ” Continuous ” study – exclude the possibility of skipping abnormal areas , which often happens in conventional research drilling, when the areas are just between adjacent wells and then surprises.

 

Research examples

EMS, AEMP-14, “Siber”

Engineering geology

EMS, AEMP-14, “Siber”

Engineering and geophysical surveys adjacent areas of the railway bridge

“Siber”

Study the structure of the railway embankment methods of electrical

“Siber”

Identifying the causes of flooding basement apartment house

EMS, AEMP-14, “Siber”

A brief report on the containment of engineering services

EMS, AEMP-14

A preliminary report on the work at the facility “Proektiruemiy energoblock”

EMS, AEMP-14

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

.